Installation of Shear Studs on Permanent Casing (Feb 04, 2019)
-
Overall Wall Construction and Excavation (Feb 04, 2019)
-
Retaining Wall Reinforcement and Formwork Prior to Concrete Placement (Feb 04, 2019)
-
Lightweight Concrete Backfill for Retaining Wall (Jan 02, 2019)
-
Soil Excavation in Front of Proposed Retaining Wall (Jan 02, 2019)
-
Final Retaining Wall Drilled Concrete Shaft Under Construction (Jan 02, 2019)
-
Demo Earth and Structure Excavation (Nov 01, 2018)
-
Demo Earth and Structure Excavation (Nov 01, 2018)
-
Stage 1C Construction (Nov 01, 2018)
-
Retaining Wall 12 Demo Earth and Structure Excavation (Oct 31, 2018)
-
Drilled Shaft Installation (Oct 09, 2018)
-
Installig Formwork for Columns (Oct 02, 2018)
-
Site View from Base RampWS (Sep 26, 2018)
-
SWWM Final Conn (Sep 24, 2018)
-
TempCasing (Sep 21, 2018)
-
Perm Casing Ins (Aug 31, 2018)
-
Backfill Facing SW (Aug 29, 2018)
-
Valve Inst Facing East (Aug 25, 2018)
-
Installation of a 90 degree bend along the 48” water main relocation approximately 25 ft below grade (Aug 02, 2018)
-
Completing the connection of the 60” combined sewer within a proposed mahole (Aug 02, 2018)
-
Inside of the 60” combined sewer approximately 19 ft below ground just north of the UIC Rec Center (Jul 31, 2018)
-
Completed water main structural lining (Jun 26, 2018)
-
Water main lining worksite and overall construction site (Jun 15, 2018)
-
Water main casing jacking pit installation (Jun 04, 2018)
-
Project site overview facing SW (May 30, 2018)
-
Drilled shaft construction east thrust restraint for SW water main relocation (May 07, 2018)
-
Construction of west thrust restraint for SW water main relocation (May 02, 2018)
-
Watermain Relocation (Apr 04, 2018)
-
Retaining Wall Work (2) (Mar 09, 2018)
-
Retaining Wall Work (Mar 09, 2018)
-
Watermain Relocation and Retaining Wall Work 2 (Mar 08, 2018)
-
Watermain Relocation and Retaining Wall Work (Mar 08, 2018)
-
Earth Excavation (Dec 11, 2017)
-
Expose UIC Utilities (Dec 04, 2017)
-
1A Traffic (Nov 17, 2017)