Harrison/Halsted Project
Harrison/Halsted Project
Harrison/Halsted Project
Harrison/Halsted Project
Harrision St. bridge Parapet wall removal
Harrision St. bridge Parapet wall removal
Halsted St. Bridge Pier #3 partial removal, stage 1
Asbestos conduit removal along Halsted St. bridge
Halsted St. bridge deck removal, east side on stage 1
Water Main 48" installation, field meeting with CDWM
Halsted St. Bridge Pier #3 partially removal, stage 2
Reinforced bar assembly at the IDOT 25th st. yard
Overall view of Harrison Bridge
Pier 2 and 3 demolition
Girder removal during a night operation
Harrison bridge deck removal continued
Halsted bridge removal
Asbestos ducts removal, Harrison Bridge
60 inch combined sewer installation
Halsted South Abutment Soil Retention System
Halsted Southe Abutment Soil Retention Tie Back
Harrison West Abutment Cage Delivery
Harrison West Abutment Drilled Shaft with permanent casing and Rebars
Harrison West Abutment Drilled Shaft
48 inch Watermain connected to existing 54 inch watermain
Halsted Pier #3 Drilled Shaft Construction
Halsted Pier #3 Drilled Shaft Construction
Halsted South Abutment Soil Retention Tie in back
Harrison Center Pier Drilled Shaft construction
Harrison West Abutment Soil Retention Tie in
Halsted North Abutment soil Retention Installation
Harrison West Abutment Drilled Shaft in progress
Harrison Center Pier Drilled Shaft construction
CSL Testing at Harrison West Abutment Drilled Shaft
Halsted Pier 3 works
Harrison West Abutment Drilled Shaft
Halsted South Abutment Drilled Shaft
Halsted South Abutment Drilled Shaft
Harrison Center Pier works
Harrison East Abutment Drilled Shaft
Harrison East Abutment construction
Halsted Pier 2 Drilled Shaft
Halsted Pier 4 Drilled Shaft
Harrison Center completed
Harrison West Abutment Drilled Shaft
Harrison West Abutment Lagging Installation
Halsted North Abutment Drilled Shaft
Harrison Bridge Decking
Harrison Bridge Decking
Harrison Bridge Detailing
Harrison Bridge Steel Erection
Retaining Wall 1802 Lagging Installation
Water Main Leak Inspection completed
Halsted Pier #1 Completed
Halsted Pier #4 in Progress
Harrison Deck Stand by
Retaining Wall 1802 Lagging
Retaining Wall 1802 Rebar
Harrison bridge removal
North East corner soil retention and excavation
North East corner soil retention and excavation
Harrison bridge removal
Halsted Pier #4 ready for poured
Harrison bridge deck poured
Harrison bridge deck poured
Harrison deck dry run
Harrison approach slab
Halsted North abutment footing
Halsted pier #5 drilled shaft testing
Harrison bridge deck poured
Harrison bridge South Parapet Wall
Cermak Pump Station West Driveway
Cermak Pump Station West Driveway
Halsted bridge Steel Girder erection
Halsted North Abutment Poured
Harrison bridge North Parapet Wall
Harrison bridge South Parapet Wall
Harrison bridge South Parapet Wall
Retaining Wall 1802 in progress
Retaining Wall 1802 sectional Poured
Halsted bridge Steel Girder erection
Halsted bridge Steel Girder erection
Harrison Bridge Sidewalk
Halsted Bridge, stage 1 completed steel erection
Halsted Bridge, stage 1 completed steel erection
PCC Base Course, 8 at the Harrison and Halsted
Retaining Wall 1802 in progress
Retaining Wall 1802 sectional completion
Street Lighting Foundation and conduits
PCC Base Course, 8 at the Harrison and Halsted
East Harrison bridge, west abutment drilled shaft, cage power washing
East Harrison bridge, west abutment drilled shaft, caging
East Harrison bridge, west abutment drilled shaft, permanent casing
East Harrison bridge, west abutment drilled shaft, rock socket coring
Harrison bridge, west abutment drilled shaft, concrete pouring
Harrison bridge, west abutment drilled shaft, concrete pouring
East Harrison bridge, west abutment drilled shaft, permanent casing
East Harrison bridge, west abutment drilled shaft
106 HMA connector between approach slabs and PCC base
Halsted bridge stage I deck pour
Halsted bridge stage I deck pour
Halsted bridge stage I reinforcement
Halsted bridge stage I reinforcement
Halsted bridge stage 2 demolition
Halsted Street stage 1 completed
Harrison bridge rails
Pier #10 drilled shaft testing
Temporary pedestrian bridge to Halsted CTA Station
East Harrison bridge demolition
East Harrison bridge demolition
East Harrison bridge west abutment construction
East Harrison bridge demolition
Harrison & Halsted Pavement Restoration
Halsted & Harrison Pavement
Halsted Bridge Demo
Halsted Sidewalk
Halsted St. Bridge Demolition
Halsted Stage2 Deck Removal
East Harrison Bridge Drill East Abutment Shafts
East Harrison Bridge Drill Soldier Pile Shafts
East Harrison Bridge Drill Soldier Pile Shafts 2
East Harrison Bridge Form West Abutment Backwall
Halsted Pier1 Demo
Halsted Pier3 Demo
Halsted Pier3 TERS
Halsted Pier4 Drilled Shafts
Halsted South Abutment Tie Back Installation
East Harrison Bridge Drill Center Pier and Soldier Pile Wall shafts  Form and pour Center Pier Crashwall, column and caps
ES_Ramp Temporary Pavement
August2015_Halsted&HarrisonPavement
Halsted South Abutmnet Drilled Shaft
North Abutment Drilled Shafts
Pier 1 Crashwall
Pier 4 Drilled Shafts
RW 1802
East Abutment Beam Seat Framing
East Abutment Fascia Wall 1
East Abutment Fascia Wall Framing
East Abutment Soldier Pile Wall
Structural Steel Installation
East Harrison Bridge Deckforming
Structural Steel Erection Over I-90/94
North Abutment Drilled Shafts
North Abutment Framing 1
North Abutment Framing 2
Pier3 Drilled Shafts 1
Pier3 Drilled Shafts 2
Pier 3 Drilled Shafts 3
Pier 5 Cap and Column Framing
South Abutmnt Prep for Framing
Bridge Deck Rebar Placement
East Harrison Bridge Deck
East Harrison Bridge Deck Pour_1
East Harrison Bridge Deck Pour_2
East Harrison Bridge Deck Pour_3
East Harrison Bridge Deck Pour_4
Halsted South Abutment Framing
Pier3 Cap & Column Framing
Pier 3 Crashwall Form & Pour
Frame Halsted West Parapet
Halsted South Approach Pour
Halsted West Parapet Pour
Halsted West Sidewalk Pour
PCC Base Course East Harrsion
Approach Connector
Binder on Halsted
CDWM Pump Station Driveway
ES Ramp Sewer Work
Harrison Sidewalk at PumpStation
Impact Attenuator
Protective Coat
Surface on Halsted
Surface Placement
West Harrison Bridge Deck Grinding
Halsted Street CTA Without Transparent Roof
Canopy Installation (1)
Canopy Installation (2)
Canopy Installation (3)
Canopy Installation (4)
Canopy Installation (5)
Canopy Installation (6)
ES Ramp Barrier Wall Framing
ES Ramp Barrier Base and Temp Pvmnt
Halsted Striping
SignInstallation ES Ramp

Harrison Street & Halsted Street Bridge
Work Completed June 2016!

As part of the overall Jane Byrne Interchange project, bridge reconstruction work began on the Harrison Street “West” Bridge over the Southbound Dan Ryan Expressway (I-90/94) & Halsted Street Bridge over the Eisenhower Expressway (I-290) on March 3, 2014!

View construction progress

Harrison Street “West” Bridge was closed beginning March 3, 2014. The bridge work is complete.
Harrison Street “East” Bridge (over Northbound I-90/94) work was completed on April 21, 2016.

The detour route for Harrison Street was along Van Buren, Racine, Jefferson and Clinton Streets.

Halsted Street Bridge work began on March 10, 2014. Halsted Street Bridge remained open to traffic with one lane of traffic in each direction during construction. Construction has been completed on the east and west half of the bridge. The remaining bridge deck was finished in February 2016. Construction of the east sidewalk was completed following the completion of the west half of the bridge.

Sidewalks on the Halsted Street Bridge remained open to pedestrian traffic during construction. However, short term closures of the CTA station entrance were anticipated for pouring concrete for the bridge deck. As the CTA station entrance on the bridge is an ADA compliant station, the CTA station entrance connection on the west side of Halsted Street was maintained. This was being accommodated through a temporary pedestrian bridge that provided pedestrian access from the east half of the bridge to the existing CTA station entrance on the west side of Halsted Street while the west half of the bridge was under construction.

Lane shifts were needed on Southbound I-90/94 and I-290 to enable bridge pier and abutment construction. A lane closure on Westbound I-290 was anticipated from Jefferson Street to the merging of the SW and NW ramp for maintaining traffic.

The construction contract was awarded to Walsh Construction on December 10, 2013, and the scope of work involved the complete removal and replacement of the existing bridge structures on Harrison Street “West” Bridge over the Southbound Dan Ryan Expressway (I-90/94) & Halsted Street Bridge over the Eisenhower Expressway (I-290). The new bridge structures are longer and reconfigured to create space underneath to accommodate the future improvements planned for the interchange between the Dan Ryan Expressway (I-90/94) and I-290, locally known as the Jane Byrne Interchange.

Halsted Street Features Include

  • Halsted Street consists of 2 lanes in each direction, reducing to 1 lane each direction by Van Buren Street intersection
  • Sidewalk on both sides varying in width from 10 to 15 feet
  • A dedicated 5 ft. bike lane in each direction
  • Modernized traffic signal at the intersection of Harrison/Halsted
  • New roadway lighting
  • Upgraded underpass bridge lighting underneath
  • A new pedestrian crosswalk with a traffic signal across Halsted Street at the existing CTA Station, including a new overhead canopy

Harrison Street Features Include

  • 1 lane in each direction
  • Sidewalk on both sides varying in width from 7 to 11 ft.
  • A dedicated 7 ft. bike lane in each direction
  • New roadway lighting
  • Upgraded underpass bridge lighting underneath

The existing approach roadways to the bridges are reconstructed within the project limits. Existing sidewalks within the project limits are reconstructed to current ADA standards per the City of Chicago requirements and existing bridge mounted signs are upgraded.

The new canopy structure across Halsted Street from the CTA station consists of an upper canopy over Halsted Street and a lower canopy over the sidewalk in front of the CTA station entrance.  A pedestrian only signal is at the location of the canopy to provide access for the CTA Bus Stop on the east side of the bridge to the CTA station on the west side of the bridge.

The Department appreciates your patience and understanding as we work to improve the multi-modal connections in your community.

If you have questions or comments regarding the construction activities, please submit via the Stay Informed.