Concrete placement on west section of viaduct structure (May 06, 2019)
-
Preparation for deck construction along eastbound lanes over Des Plaines Street (Mar 22, 2019)
-
Construction of eastbound I-290 bridge pier to the east of the northbound I-90:94 lanes (Mar 19, 2019)
-
Temporary shoring of the existing steel beams to remain during concrete pier reconstruction (Mar 12, 2019)
-
Installation of steel beams along eastbound lanes over Des Plaines Street (Mar 05, 2019)
-
Drilled Shaft Construction for Bridge over I-90:94 (Jan 08, 2019)
-
Existing Steel Beam Removal over Des Plaines Street (Jan 08, 2019)
-
Deck Pour (Sep 20, 2018)
-
Unit 2 Structural Steel (Aug 30, 2018)
-
Drilling Shafts for Retaining Wall between Peoria Street and Halsted Street (Aug 22, 2018)
-
Excavation for Retaining Wall Along EB I-290 at Halsted Street (Aug 22, 2018)
-
Cutting Machine for Bore and Jack Sewer Installation (Aug 22, 2018)
-
Completed Drill Shafts between Peoria Street and Halsted Street (Aug 21, 2018)
-
Completed Drill Shafts and Excavation West of Morgan Street (Aug 21, 2018)
-
Forming Pier 2 (Aug 14, 2018)
-
Deck Pour (Aug 14, 2018)
-
Temporary Pavement near Halsted (Aug 14, 2018)
-
Pier 2 Forming (Aug 14, 2018)
-
oscillating_pier_3_shafts (Aug 09, 2018)
-
ramp_demo_2 (Aug 09, 2018)
-
ramp_demo (Aug 09, 2018)
-
pier_1_cap_column_pour_xl (Aug 09, 2018)
-
Unit 1 Structual Steel (Aug 07, 2018)
-
Stabilized Subbase (Aug 03, 2018)
-
Temporary Decking for Ramp NE (Aug 03, 2018)
-
Unit 2 Deck Pour (Aug 03, 2018)
-
EBI-290 (Jun 05, 2018)
-
EB I-290 Structural concrete repair for substructure has been completed (May 22, 2018)
-
EB I-290 Loomis to Canal 2 (May 04, 2018)
-
EB I-290 Loomis to Canal 3 (May 04, 2018)
-
EB I-290 Loomis to Canal 1 (May 04, 2018)
-
SE Ramp Demo (Apr 26, 2018)
-
Drilling Pier 1 shaft (Apr 02, 2018)
-
EB I-290 Completed Temporary Pavement (Mar 30, 2018)
-
EB I-290 Retaining Wall Construction (Mar 29, 2018)
-
EB I-290 Storm Sewer Installation (Mar 29, 2018)
-
EB I-290 Pavement Removal (Mar 08, 2018)
-
EB I-290 Pavement Removal 2 (Feb 21, 2018)
-
Reinforcement prepared for drilled shaft retaining wall between Peoria Street and Halsted Street (Dec 28, 2017)
-
Site clearing west of Morgan Street in preparation of retaining wall construction (Dec 07, 2017)