Morgan Street Bridge Construction North Abutment
Morgan Street Bridge Construction North Abutment
Morgan Street Bridge Construction North Abutment
Morgan Street Bridge Construction North Abutment
Morgan Street Bridge Construction North Abutment
Morgan Street Bridge Construction South Abutment
Morgan Street Bridge Construction South Abutment
Morgan Street Bridge Construction South Abutment
Morgan Street Bridge Construction South Abutment
Morgan Street Bridge Construction
ComEd
ComEd
ComEd
Bridge Demolition
Bridge Demolition
Bridge Demolition
Bridge Demolition
Retention System
Retention System
Retention System
Retention System
Retention System
Retention System
Retention System
Retention System
Retention System
Micropiles
Micropiles
Micropiles
Micropiles
Drilled Shaft Casing Installation
Drilled Shaft Casing Installation
Drilled Shaft in Rock
Drilled Shaft in Soil
Drilled Shaft Rebar Cage Installation
Drilled Shaft Rebar Cage Installation
Abutment Wall
Abutment Wall
Abutment Wall
Abutment Wall
Abutment Wall
Abutment Wall
Pier
Pier
Pier
Pier
Pier
Bridge Deck Concrete Pouring
Bridge Deck Concrete Pouring
Bridge Deck Concrete Pouring
Bridge Deck Concrete Pouring
Bridge Deck Concrete Pouring
Deck Framing
Deck Framing
Proposed Beams Installation
Proposed Beams Installation
Proposed Beams
QC-QA
Reinforcement Bars Installation
Reinforcement Bars Installation
Temp Bent.
Temp Pedestrian Bridge Looking East
Temp Pedestrian Bridge Looking South
Temp Pedestrian Ramp Looking North
Temp Pedestrian Ramp Looking South
Morgan Street Bridge Construction
Morgan Street Bridge Construction
Morgan Street Bridge Construction
Morgan Street Bridge Construction
Morgan Street Bridge Construction - Drilled Shaft Operation
Morgan Street Bridge Construction - Drilled Shaft Operation
Morgan Street Bridge Construction - Drilled Shaft Operation
Beam Erection - Morgan
Beams 6, 5, 4
Brdige deck pour (east half)
Installation of Bridge Mounted Sign
Installation of rebars (east half)
Sidewalk pour (east side)
Morgan Street Bridge Opening
Morgan Street Bridge Opening
Morgan Street Bridge Opening
Morgan Street Bridge Opening
Morgan Street Bridge Opening
Bikers on Morgan Street

Morgan Street Bridge –
Work completed October 6, 2014!

As part of the overall Circle Interchange project, the Morgan Street Bridge, as well as the Westbound I-290 exit ramp to Morgan Street, was closed for reconstruction beginning September 2013 until approximately late Fall, 2014.

View construction progress.

The Morgan Street Bridge was closed in its entirety and was re-opened to vehicular traffic in late Fall, 2014. Morgan Street CTA station was open to the public by Memorial Day.

The project included reconstruction of Morgan Bridge over I-290 and CTA Blue Line, construction of retaining walls, relocation of existing water main and sewers, traffic signals, and roadway lighting. The project also required extensive coordination with ComEd to maintain their existing high voltage cables during the construction of the new bridge.

The detour for the Morgan Street Bridge closure was Van Buren Street to Racine Street to Harrison Street. 

The detour for the Westbound I-290 exit ramp to Morgan Street was:

  • From Southbound I-90/94 - exit Adams Street
  • From Northbound I-90/94 - exit Ashland Avenue, backtrack east via Jackson Boulevard or Harrison Street
  • Exiting access is prohibited from Westbound I-290/Congress Parkway

Additionally, the Morgan Street CTA entrance was closed starting September 23, 2013. The nearby CTA stations at Peoria Street and Halsted Street continued full service until the Morgan Street Station was opened.

Lane shifts were needed on I-290 to enable bridge pier and abutment construction. A lane closure on westbound I-290 was anticipated from Jefferson Street to the merging of the SW and NW ramp for maintaining traffic.

The construction contract was awarded to F.H. Paschen/S.N. Nielsen, Inc. on August 22, 2013, and the scope of work involved the complete removal and replacement of the existing bridge structure which carries Morgan Street over Eisenhower Expressway (I-290). The new bridge structure is longer to create space underneath along I-290 for the future improvements planned for the interchange between the Dan Ryan Expressway (I-90/94) and I-290, locally known as the Circle Interchange.

Morgan Street Features Include:

  • Morgan Street consists of 2 lanes in each direction
  • Ornamental bridge parapets for fencing and railings
  • Sidewalk on both sides varying in width from 9 to 11 feet
  • The traffic signal at the Morgan St. and Westbound I-290 Exit Ramp/Tilden St. intersection is modernized
  • Underpass bridge lighting is upgraded along I-290 underneath the bridge
  • Existing sidewalks are reconstructed to current ADA standards per the City of Chicago requirements.
  • Existing bridge mounted signs are upgraded.

The Department appreciates your patience and understanding as we work to improve the multi-modal connections in your community.

If you have questions or comments regarding the construction activities, please submit via the Stay Informed.