Facebook

 

 

Photo Gallery

To view a site specific photo album, scroll down.

Eastbound I-290 east of Loomis Street to east of Canal Street
December 28, 2017
The Eastbound mainline lanes are to be reconstructed as well as the Eastbound bridge over I-90/94. The Congress Parkway Viaduct bridge will also be rehabilitated. The project will also construct proposed retaining walls on the south side of I-290, complete retaining wall repairs near the CTA and CTA Tunnel, reconstruct the Canal Street Exit Ramp and remove the existing ramp from I-90/94 Southbound to I-290 Eastbound, which will be reconstructed in a future project. In addition to the roadway and structure reconstruction, other project work elements include, drainage, high mast interchange lighting, ITS, signing, landscaping and pavement markings.
 
Download / jpg 5.72 MB
Reinforcement prepared for drilled shaft retaining wall between Peoria Street and Halsted Street
Reinforcement prepared for drilled shaft retaining wall between Peoria Street and Halsted Street
Albums